采用吊车及军用梁拆除既有线T梁施工技术
引用本文:谭文.采用吊车及军用梁拆除既有线T梁施工技术[J].山西建筑,2011,37(14):159-160.
作者姓名:谭文
作者单位:中铁十一局集团第一工程有限公司,湖北襄阳,441104
摘    要:介绍了跨襄渝线既有源圆路立交桥采用吊车、军用梁拆除既有线T梁施工技术,对其施工方法及安全防护技术作了归纳,通过该技术的应用,在场地有限情况下,安全、正点、快捷的完成了施工任务。

关 键 词:立交桥  既有线  军用梁  拆除

On dismantling existing line T beam construction with crane and military beam
TAN Wen.On dismantling existing line T beam construction with crane and military beam[J].Shanxi Architecture,2011,37(14):159-160.
Authors:TAN Wen
Abstract:The paper introduces the existing Yuanyuan road flyover along Xiang-Yu railway to adopt the construction technique of the crane and military dismantling existing line T beam,sums up the construction methods and the safety protection technique,so as to complete the construction task in the safe,punctual and speedy way in the limited field by applying the technique.
Keywords:flyover  existing line  military beam  dismantling