首页 | 本学科首页   官方微博 | 高级检索  
     

高层建筑干挂石材幕墙监理质量控制工作
引用本文:李武玉. 高层建筑干挂石材幕墙监理质量控制工作[J]. 山西建筑, 2011, 37(13): 208-209
作者姓名:李武玉
作者单位:阳泉市工程建设监理中心,山西,阳泉,045000
摘    要:结合具体工程实例,从实施监理的前期工作、施工过程中的监理质量控制、竣工验收及其后期维护工作三个阶段阐述了高层建筑干挂石材幕墙监理质量控制工作,最后总结了监理工作体会,以期指导工程实践。

关 键 词:高层建筑  干挂石材幕墙  质量控制  使用安全

On supervision of quality control in dry-hanging stone curtain walls in high-rise buildings
LI Wu-yu. On supervision of quality control in dry-hanging stone curtain walls in high-rise buildings[J]. Shanxi Architecture, 2011, 37(13): 208-209
Authors:LI Wu-yu
Abstract:Combining with the factual projects,the paper illustrates the supervision of quality control in dry-hanging stone curtain walls in high-rise buildings from the preparation of the implementation supervision,the supervision of quality control in the construction process,the complete acceptance and the maintenance in later period,and sums up the supervision consideration,so as to direct the engineering practice.
Keywords:high-rise building  dry-hanging stone curtain wall  quality control  application safety
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号