首页 | 本学科首页   官方微博 | 高级检索  
     

建设工程项目施工阶段冲突影响因素——基于 ISM+MICMAC 分析
引用本文:单腾飞,侯学良.建设工程项目施工阶段冲突影响因素——基于 ISM+MICMAC 分析[J].工程管理学报,2022,36(3):102-106.
作者姓名:单腾飞  侯学良
作者单位:华北电力大学 工程技术与管理研究所
摘    要:为能够有效应对建设工程项目在施工阶段产生的冲突事件,通过文献查阅,初步确定影响项目顺利施工的 15 个冲突因素,进而通过专家咨询和预调研的方法合并筛选, 采用统计软件进行分析, 最终确定 12 项影响项目顺利施工的冲突影响因素。运用解释结构模型揭示了各因素之间的逻辑关系,并用交叉矩阵相乘法进行验证分析。结果表明, 解释结构模型和交叉矩阵相乘法在影响因素的结果上一致, 从而证明了分析过程的合理性和科学性。根据解释结构模型的底层影响因素, 结合建设工程项目施工的具体情况,分别从互适性平衡模式和员工素质培训等方面给施工管理人员提出了相关建议。

关 键 词:建设工程  施工阶段  冲突管理  解释结构模型  交叉矩阵相乘法

Analysis of Conflict Influencing Factors in Construction ProjectConstruction Stage Based on ISM + MICMAC
SHAN Teng-fei,HOU Xue-liang.Analysis of Conflict Influencing Factors in Construction ProjectConstruction Stage Based on ISM + MICMAC[J].Journal of Engineering Management,2022,36(3):102-106.
Authors:SHAN Teng-fei  HOU Xue-liang
Affiliation:Institute of Engineering Technology and Management, North China Electric Power University
Abstract:In order to effectively deal with the conflict events in the construction stage of the construction project, 15 conflictfactors affecting the smooth construction of the project are preliminarily determined through the method of literature review, thencombined and screened through the method of expert consultation and pre investigation, and analyzed by statistical software. Finally,12 conflict factors affecting the smooth construction of the construction project are determined. The logical relationship betweeneach factor is revealed by using the explanatory structure model, and verified and analyzed by cross matrix multiplication. Theresults show that the interpretation structure model and the multiplication of cross matrix are consistent in the results of influencingfactors, which proves the rationality and scientificity of the analysis process. Finally, according to the underlying influencing factorsof the interpretation structure model and combined with the specific situation of the construction project, relevant suggestions are putforward to the construction management personnel from aspects of mutual adaptability balance mode, staff quality training andphysical examination.
Keywords:construction project  construction stage  conflict management  interpretative structural modeling  cross matrixmultiplication
点击此处可从《工程管理学报》浏览原始摘要信息
点击此处可从《工程管理学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号