摘    要:丰城电厂#1机组DCS控制系统存在设备老化严重、控制系统功能不完善等诸多问题,因此对#1机组原DCS控制系统进行了改造,系统改造采用更为先进的DCS控制系统MAXDNA,其网络结构、系统配置及各工作站功能发生了较大变化。

关 键 词:DCS改造  改造方案  功能变化

Discussion on DCS Transformation of Fengcheng Power Plant 300MW Unit
ZHOU Jian,MA Yao-feng.Discussion on DCS Transformation of Fengcheng Power Plant 300MW Unit[J].Journal of Jiangxi Electrical University For Staff,2009(4):18-20.
Authors:ZHOU Jian  MA Yao-feng
Affiliation:(Jiangxi Fengcheng Power Generation CO.,LTD, Fengcheng 331100, China)
Abstract:There are some problems in Fengcheng Power Plant Unit #1 DCS control system,such as equipments aging, imperfect control system etc.So the orginal DCS control system is transformed.The new DCS system-adopts more advanced MAXDNA system. Its network structure,system configuration and each workstation function are advanced.
Keywords:DCS transformation  transform project  function change