首页 | 本学科首页   官方微博 | 高级检索  
     

浅谈逆作法立柱和立柱桩的施工关键点
引用本文:郭庆华. 浅谈逆作法立柱和立柱桩的施工关键点[J]. 山西建筑, 2008, 34(25)
作者姓名:郭庆华
作者单位:上海市地矿建设有限责任公司,上海,200072
摘    要:研究了逆作法基坑支护工程中临时立柱施工精度的控制方法,分析了立柱差异沉降的因素以及控制措施,从而确保其在施工全过程中满足精度和沉降控制的要求.

关 键 词:逆作法  临时立柱  垂直精度  差异沉降

A brief talk on the construction key points of the temporary columns and piles in reverse method
GUO Qing-hua. A brief talk on the construction key points of the temporary columns and piles in reverse method[J]. Shanxi Architecture, 2008, 34(25)
Authors:GUO Qing-hua
Affiliation:GUO Qing-hua
Abstract:The construction precision control method of the temporary columns on reverse method in pit supporting projects is researched in the paper.The different settlement factors of the columns are analyzed and some useful control measures are enumerated.The precision and settlement control must meet the request of code.
Keywords:reverse method  temporary columns  upright precision  different settlement
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号