首页 | 本学科首页   官方微博 | 高级检索  
     

基于平衡计分卡的水电施工企业绩效评价
引用本文:马莹. 基于平衡计分卡的水电施工企业绩效评价[J]. 水利水电技术, 2013, 44(9): 86
作者姓名:马莹
作者单位:(武汉理工大学管理学院,湖北武汉430070)
摘    要:本文主要研究了基于平衡计分卡的水电施工企业的绩效评价体系。首先介绍了研究的意义、目的,以及国内外的研究现状。然后,以某水电施工企业为例,基于平衡计分卡设计了具体的绩效评价指标。最后,提出了促进水电施工企业有效运用平衡计分卡的建议。

关 键 词:水电施工企业  绩效评价  平衡计分卡  层次分析法  
收稿时间:2013-06-17

Balanced scorecard based performance evaluation on hydropower construction enterprise
MA Ying. Balanced scorecard based performance evaluation on hydropower construction enterprise[J]. Water Resources and Hydropower Engineering, 2013, 44(9): 86
Authors:MA Ying
Affiliation:(School of Management of Wuhan University of Technology, Wuhan430070, Hubei,China)
Abstract:The balanced scorecard based performance evaluation system of hydropower construction enterprise is mainly studied herein. Firstly, the significance and purpose of this study as well as the study status at home and abroad are described, and then the specific indexes for the performance evaluation are designed based on balanced scorecard by taking a hydropower construction enterprise as the study case, finally, some suggestions to promote the effective application of the balanced scorecard to hydropower construction enterprise are put forward as well.
Keywords:hydropower construction enterprise  performance evaluation  balanced scorecard  analytic hierarchy process
本文献已被 万方数据 等数据库收录!
点击此处可从《水利水电技术》浏览原始摘要信息
点击此处可从《水利水电技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号