首页 | 本学科首页   官方微博 | 高级检索  
     

浅谈塑性混凝土防渗墙在花山水库除险加固工程中的应用
引用本文:劳正绍,梁水新,陆家辉. 浅谈塑性混凝土防渗墙在花山水库除险加固工程中的应用[J]. 中国水能及电气化, 2016, 0(8). DOI: 10.16617/j.cnki.11-5543/TK.2016.08.003
作者姓名:劳正绍  梁水新  陆家辉
作者单位:广西润能水电设计研究有限公司,广西南宁,530007
摘    要:塑性混凝土防渗墙是一种塑性墙体结构,具有一定的抗压强度和抗渗能力,有较低的弹性模量,并可人为地控制,抑制渗漏、管涌等。塑性混凝土防渗墙不仅能有效截断坝(土)体的渗透水流和降低坝(土)体中渗透坡降,还能承受一定的垂直和水平荷载,能适应周围坝(土)体变形、地基变形,大大减小墙体内应力,避免墙体开裂,且可节约水泥,降低工程防渗造价,效果显著。

关 键 词:塑性混凝土防渗墙  试验  效果

On the application of plastic concrete cut-off wall in Huashan Reservoir Risk Removal Reinforcement Project
Abstract:Plastic concrete cut-off wall is a plastic wall structure with certain compressive strength and impermeability capacity,and lower modulus of elasticity,which can be controlled artificially for curbing leakage,piping,etc.Plastic concrete cut-off wall not only can cut off seepage flow of the dam (soil)body and lower seepage slope in the dam (soil) body,but also can withstand certain vertical and horizontal load.It can adapt to the surrounding dam (soil ) body deformation and foundation deformation,thereby greatly reducing stress in the wall,avoiding wall cracking,saving cement and reducing the cost of the engineering seepage control with remarkable effect.
Keywords:plastic concrete cut-off wall  test  effect
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号