克孜尔水库F_2断层除险加固防渗效果评价 |
| |
引用本文: | 李红梅. 克孜尔水库F_2断层除险加固防渗效果评价[J]. 中国水能及电气化, 2016, 0(8): 21-24. DOI: 10.16617/j.cnki.11-5543/TK.2016.08.008 |
| |
作者姓名: | 李红梅 |
| |
作者单位: | 新疆克孜尔水库管理局,新疆拜城,842313 |
| |
摘 要: | 克孜尔水库主副坝之间存在F_2断层,且断层仍在活动,本文根据实测资料对F_2断层除险加固防渗效果作了评价,认为防渗达到了一定效果,后期仍需加强监测。
|
关 键 词: | 克孜尔水库 F2 断层 防渗 |
Evaluation of risk removal reinforcement seepage control effect in Kizil Reservoir F2 fault |
| |
Abstract: | There is F2 fault between main dam and auxiliary dam in Kizil Reservoir.The fault is still active.In the paper, risk removal reinforcement effect of F2 fault is evaluated according to measured data.It is believed that the seepage control reaches certain effect,and monitoring still should be strengthened consequently. |
| |
Keywords: | Kizil Reservoir F2 fault seepage control |
本文献已被 CNKI 万方数据 等数据库收录! |
|