长大隧道快速掘进机械配置
引用本文:朱庆长.长大隧道快速掘进机械配置[J].山西建筑,2008,34(16):346-347.
作者姓名:朱庆长
作者单位:中铁十四局集团一公司,山东,日照,276926
摘    要:结合具体工程实例,针对特长隧道掘进特点,阐述了机械配置、运输方式的选择、钻爆作业、运输装碴作业、锚喷支护作业及机械车辆调配方案,得出该方案满足施工需求的结论,对类似工程有参考价值。

关 键 词:开挖特点  机械选择配套  效果分析
文章编号:1009-6825(2008)16-0346-02
修稿时间:2008年2月14日

Machinery disposition of long-big tunnel for swift digging
ZHU Qing-chang.Machinery disposition of long-big tunnel for swift digging[J].Shanxi Architecture,2008,34(16):346-347.
Authors:ZHU Qing-chang
Affiliation:ZHU Qing-chang
Abstract:Combing with the specific engineering case and according to the characters of digging on the long-especially tunnel,the paper makes a elaboration from many aspects,mainly include the election of machinery disposition and transportation approach,drilling-explode assignment,transportation-carrying dregs assignment,anchor-spurting support assignment and allocation plan machinery vehicle.Through these aspects' elaboration,the plan is proved to satisfy construction demands,which will have a certain reference value for similar projects.
Keywords:characters of initial digging  election disposition for machinery  effect analysis