深基坑开挖诱发临近建筑物地表开裂的机理研究
引用本文:余天智,彭冰,陈杰,任禹鑫,马佳兵.深基坑开挖诱发临近建筑物地表开裂的机理研究[J].水利与建筑工程学报,2021,0(1):91-95.
作者姓名:余天智  彭冰  陈杰  任禹鑫  马佳兵
作者单位:1.华北水利水电大学岩土工程与水工结构研究院,河南郑州450046;2.陕西省矿产资源调查评审指导中心,陕西西安710082;3.中水珠江勘测设计研究院有限公司,广东广州510610
摘    要:为了研究郑州市一处深基坑施工中自身结构稳定,但临近建筑物地表严重开裂的工程问题,对其监测数据的分布特征进行研究,对后续数值计算的精度进行验证,由此得到深基坑开挖过程中土体及围护结构的特殊变形分布规律,为进一步研究其破坏机理,以放大效应对模型进行处理。结果表明,由于护坡桩水平变形,引发基坑土体变形,经锚索加固的土体,随着距基坑距离增加而变形,但在锚索锚固端附近变形却急剧增大,远远大于周围土体变形;水平方向变形不均匀进而引发竖直方向不均匀沉降,在土体及上部建筑自重作用下,竖向不均匀沉降继续发展,当不均匀沉降过大,必然出现拉张裂缝。

关 键 词:基坑开挖  不均匀沉降  桩锚支护  开裂  数值模拟分析

Deformation Mechanism of Ground Cracking of Adjacent Buildings Induced by Deep Foundation Pit Excavation
YU Tianzhi,PENG Bing,CHEN Jie,REN Yuxin,MA Jiabing.Deformation Mechanism of Ground Cracking of Adjacent Buildings Induced by Deep Foundation Pit Excavation[J].Journal of Water Resources Architectural Engineering,2021,0(1):91-95.
Authors:YU Tianzhi  PENG Bing  CHEN Jie  REN Yuxin  MA Jiabing
Affiliation:(Institute of Geotechnical Engineering and Hydraulic Structure,North China University of Water Resources and Electric Power,Zhengzhou,He'nan 450046,China;Shaanxi Mineral Resources Investigation and Eraluation Guidance Center,Xi'an,Shaanxi 710082,China;China Water Resources Pearl River Planning Suveying and Designing Co.,Ld.,Guangzhou,Gruangdong 510610,China)
Abstract:In order to analyze the structure stability of a deep foundation pit construction in Zhengzhou and the engineering problems such as adjacent building surface cracks,the monitoring data was adopted to develop a model of the distribution characteristics,which is then verified by numerical calculation,the resulting soil in the process of deep foundation pit excavation and retaining structures of special distribution regularity of deformation.The failure mechanism is further discussed to test the amplification effect of the model.The results show that the horizontal deformation of soils behind the pile is caused by piles,which reduces with the length of founding pit,but it greatly increases near the anchorage end of the anchor cables,because the soils are much strengthened by the cables,while the other soils still keep the same mechanical properties.If the cables were not so long enough that the horizontal deformation would be very much.So the vertical differential settlement will occur.
Keywords:excavation of foundation pit  different settlement  pile-anchor support  crcaks  numerical modelling analysis
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《水利与建筑工程学报》浏览原始摘要信息
点击此处可从《水利与建筑工程学报》下载全文