首页 | 本学科首页   官方微博 | 高级检索  
     

牛栏江中上段枯季径流分析及月径流模拟
引用本文:王东升,刘新有,袁树堂,田静维.牛栏江中上段枯季径流分析及月径流模拟[J].水电能源科学,2019,37(5):10-14.
作者姓名:王东升  刘新有  袁树堂  田静维
作者单位:云南省水文水资源局;云南省滇中引水工程建设管理局昆明分局;云南省水文水资源局昆明分局
基金项目:国家自然科学基金重点项目(91547205)
摘    要:为分析牛栏江中上段中长期径流特征,基于牛栏江中上段七星桥水文站1990~2016年降水、蒸发、径流实测资料,使用一元线性回归、退水系数、离散系数等分析了牛栏江枯季径流特点及趋势。结果表明,牛栏江中上段枯季径流量、降水量无明显变化趋势,但蒸发量有明显减少趋势,枯季径流量占年度径流量的比例有增加趋势,11月至次年4月,月径流量逐步大幅减少,但趋势分析表明,11月径流量有明显减少趋势,12月无明显变化趋势,1~4月径流量呈增加趋势,枯季各月径流量总体趋向于均衡。使用Pearson相关分析法识别枯季月径流预报因子,基于二次回归正交旋转设计,构建了枯季各月预报模型,模型模拟检验表明,11月径流预报模型精度为丙级,12月至次年4月径流预报模型精度为乙级。研究成果可为牛栏江—滇池补水工程枯季水资源调度提供依据。

关 键 词:Pearson相关  枯季径流分析  二次回归正交旋转设计  月径流模拟  牛栏江-滇池补水工程

Analysis of Dry Season Runoff in the Middle and Upper Reaches of Niulanjiang River and Simulation of Monthly Runoff
WANG Dong-sheng,LIU Xin-you,YUAN Shu-tang,TIAN Jing-wei.Analysis of Dry Season Runoff in the Middle and Upper Reaches of Niulanjiang River and Simulation of Monthly Runoff[J].International Journal Hydroelectric Energy,2019,37(5):10-14.
Authors:WANG Dong-sheng  LIU Xin-you  YUAN Shu-tang  TIAN Jing-wei
Affiliation:(Yunnan Provincial Bureau of Hydrology and Water Resources,Kunming 650106,China;Kunming Branch of Water Diversion Engineering Construction Administration for Central Yunnan,Kunming 650021,China;Kunming Branch of Yunnan Provincial Bureau of Hydrology and Water Resources,Kunming 650106,China)
Abstract:Based on the 1990-2016 precipitation, evaporation and runoff data from the Qixingqiao Hydrological Station in the upper and middle sections of the Niulan River, this study analyzed the characteristics and trends of the runoff in the Niulan River during the dry season by using linear regression, water withdrawal coefficient and dispersion coefficient. The results show that the runoff and precipitation of the upper middle section of the Niulan River have no obvious change trend, but the evaporation has a significant decrease trend. The dry season runoff accounted for a trend increase in the annual runoff ratio. From November to April in the next year, the monthly runoff decreased gradually, but the trend analysis showed that the runoff in November appeared a downward trend, and there was no obvious change trend in December. The runoff in January, February, March and April showed an upward trend, and the average runoff in each month of the dry season tended to be balanced. The pearson correlation analysis method was used to identify the monthly runoff forecasting factors in the dry season. Based on the quadratic regression orthogonal rotation design, the monthly forecast model of the dry season was constructed. The model simulation test shows that the accuracy of the runoff forecast model in November is C, and the accuracy of the runoff forecast model during December to April in the next year is Grade B. The research results can provide basis for water resources allocation in the dry season in the Niulanjiang-Dianchi water supply projects.
Keywords:Pearson correlation  dry season runoff analysis  quadratic regression orthogonal rotation design  monthly runoff simulation  Niulanjiang-Dianchi water replenishment project
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号