泄洪坝段基础约束区混凝土施工的温度控制
引用本文:李舜才,钟卫华. 泄洪坝段基础约束区混凝土施工的温度控制[J]. 中国三峡建设, 2001, 8(9): 5-8
作者姓名:李舜才  钟卫华
作者单位:中国葛洲坝集团公司
摘    要:三峡工程泄洪坝段是三峡大坝坝体最高、受力最大、结构复杂、技术要求最高的重要建筑物之一 ,由于受各种因素的影响 ,坝体基础约束区混凝土在高温季节持续浇筑 ,通过设计、施工采取一系列综合措施后 ,克服了高强度、大方量约束区混凝土在高温季节浇筑的温度控制难题 ,保证了混凝土的质量和进度。

关 键 词:泄洪坝段  约束区混凝土  高温季节  温度控制
文章编号:1006-6349(2001)-0005-04
修稿时间:2001-07-01

Concrete temperature control in foundation restraint area at spillway section
Abstract:The spillway is one of the important structures for the Three Gorges project,with the highest blocks,bearing the max.water pressure,complex geometry and strict technical requirements.Due to various factors,the concrete in the foundation restraint area must be placed continuously in hot weather.The tough problem with the temperature control.over concreting in the foundation restraint area with higher placment rates and high volume,has been offset by a series of integrated measures proposed by the designer and the contractor,based on the quality and schedule requirements.
Keywords:spillway section  concrete in restraint area  hot weather  temperature control.