首页 | 本学科首页   官方微博 | 高级检索  
     


Yield-to-BIM: impacts of BIM maturity on project performance
Authors:Wim Smits  Marc van Buiten
Affiliation:1. Department of Construction Engineering &2. Management, University of Twente, Enschede, the Netherlands
Abstract:How does organizational experience (maturity) with building information modelling (BIM) impact on the broad implementation of BIM and on company performance? A survey of Dutch architectural, engineering, construction, and operation (AECO) professionals (n?=?890) is used to examine their perceptions of the impact of BIM maturity on firm performance. Survey items included measures of BIM element maturity (i.e., strategy, BIM uses, process, information, infrastructure and personnel), and key performance indicators (time, cost and quality performance). Surprisingly, the maturity of the BIM implementation strategy was the only reliable predictor of time, cost and quality performance. The result suggests that the impact of BIM maturity on project performance may be limited and it cautions against overoptimistic appraisals of BIM. In addition to the contribution to the literature on BIM performance, the paper should be of interest to the practitioner contemplating BIM investments.
Keywords:assessment model  building information modelling (BIM)  maturity  performance indicators  survey
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号