首页 | 本学科首页   官方微博 | 高级检索  
     

下行式移动模架现浇箱梁施工方法
引用本文:朱树坤. 下行式移动模架现浇箱梁施工方法[J]. 山西建筑, 2009, 35(12): 135-136
作者姓名:朱树坤
作者单位:中铁三局集团五公司,山西,晋中,030600
摘    要:以郑西铁路客运专线枣香河大桥为例,介绍了铁路下行式移动模架的结构及安装工艺、现浇箱梁工艺、移动模架过孔工艺等环节控制要点,从而推广该施工方法的应用。

关 键 词:移动模架  现浇箱梁  过孔工艺

Downgoing slide shuttering form cast-in-place box beam construction method
ZHU Shu-kun. Downgoing slide shuttering form cast-in-place box beam construction method[J]. Shanxi Architecture, 2009, 35(12): 135-136
Authors:ZHU Shu-kun
Affiliation:ZHU Shu-kun
Abstract:Taking Zheng-Xi railway passenger dedicated line Zaoxiang river large Bridge as example,the author introduces some link control important points,such as railway downgoing shutter slide shuttering form's structure,installation technology,cast-in-place box beam technology slide shuttering form via hole technology,thus promoting the application of this construction method.
Keywords:slide shuttering form  cast-in-place box beam  via hole technology  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号