引用本文:于少峰,陈绍洪,韩斌. 九顶山铜钼矿软岩巷道锚喷网支护研究[J]. 铜业工程, 2013, 0(2): 33-36
作者姓名:于少峰  陈绍洪  韩斌
作者单位:1. 北京科技大学金属矿山高效开采与安全教育部重点实验室,北京,100083
2. 云铜集团弥度县九顶山矿业有限公司,云南弥渡,675600
基金项目:国家自然科学基金重点项目(50934002);教育部长江学者和创新团队发展计划项目(IRT0950);国家自然科学基金项目(51074013);国家“十二五”科技支撑计划项目(2012BAB08802)
摘    要:针对九顶山铜钼矿矿体松散破碎、自稳能力差及需大量支护等特点,优选锚喷网支护方式对岩体进行加固;确定了树脂锚杆、基于32.5级普通硅酸盐水泥所制混凝土与Q235钢筋网联合支护巷道;设计了锚喷网支护形式并规定了施工工艺技术,并在五中段二盘二穿2P213测点附近进行了工业试验;为检测支护效果,进行了巷道收敛变形监测,前60天,巷道变形由约7mm加速降低至约3mm;60天后巷道变形趋缓,并在100天后逐渐降低至0.1mm并保持基本不变;水平收敛值大于顶板;结果表明:锚喷网支护能够有效控制巷道移动变形,提高岩体整体性及稳定性,增强井下工人安全性。

关 键 词:自稳能力差  锚喷网支护  支护形式  施工工艺  巷道收敛变形  有效控制

Research on Bolt -shotcrete -net Supporting in the Soft Rock Roadway of Jiu Dingshan Copper- molybdenum Mine
YU Shao-feng , CHEN Shao-hong , HAN Bin. Research on Bolt -shotcrete -net Supporting in the Soft Rock Roadway of Jiu Dingshan Copper- molybdenum Mine[J]. Copper Engineering, 2013, 0(2): 33-36
Authors:YU Shao-feng    CHEN Shao-hong    HAN Bin
Affiliation:1 Key Laboratory of the Ministry of Education, Metal Mine High - efficient Exploitation and Security, University of science and technology Beijing, Beijing 100083, China; 2. CHALCO Yunnan Copper CO. ,LTD BRANCH, Jiu Dingshan ENAMCO of Midu county, Midu, Yunnan 675600, China)
Abstract:Copper - molybdenum ore body of Jiu Dingshan is loose and broken whose self - stable ability is bad consequently. Bolt - shotcrete - net combined supporting was selected to strengthen the rock; Materials and parameters of resin bolt, shotcrete made based on the 32.5 - magnitude ordinary portland cement and Q235 type of net were determined, while the supporting form and con- struction technology of bolt - shotcrete - net combined supporting were designed. Industrial test around station 2P213 of panel 2 - punc- ture 2 in middle - piece 5 was launched; In order to detect the effects of supporting, the convergence - deformation of the roadway was monitored: in the first 60 days, deformation of the roadway was decreased from 7 mm to 3 mm, and after 60 days, the roadway de- formed slowly. After 100 days, deformation of the roadway came to 0.1 mm. Results showed that : bolt - shotcrete - net combined sup- porting could control the mobility and deformation of roadway, improve integrity and stability of the rock, and enhance the safety of the workers under the mine efficiently.
Keywords:bolt- shotcrete -net combined supporting  supporting form  construction technology  convergence -deformation of the roadway