首页 | 本学科首页   官方微博 | 高级检索  
     

湖州某污水处理厂的地基处理
引用本文:徐奇.湖州某污水处理厂的地基处理[J].山西建筑,2010,36(28):81-82.
作者姓名:徐奇
作者单位:湖州市水务集团有限公司,浙江湖州,313000
摘    要:以湖州市某污水处理厂扩建工程为例,结合工程场地地质概况,通过对厂区地基处理方案,进行综合分析比较,确定了采用PC管桩处理方案并作了具体阐述,指出了施工中应注意的问题,经实践证明,采用PC管桩处理地基加固效果良好。

关 键 词:污水处理厂  地基处理方案  PC管桩  承载力

On foundation treatment for some sewage treatment plant in Huzhou
XU Qi.On foundation treatment for some sewage treatment plant in Huzhou[J].Shanxi Architecture,2010,36(28):81-82.
Authors:XU Qi
Abstract:Taking the expansion project for some sewage treatment plant in Huzhou as an example, the paper combining with field geological survey of project, undertakes the comprehensive analysis and comparison for the foundation treatment scheme in the area, identifies the PC pipe pile treatment scheme and has the concrete illustration, points out some precautions, and proves the adoption of the PC pipe pile for the treatment of foundation is effective.
Keywords:sewage treatment plant  foundation treatment scheme  PC pipe pile  loading capacity
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号