龙固煤矿综采工作面安装的施工方法
引用本文:刘永. 龙固煤矿综采工作面安装的施工方法[J]. 煤炭技术, 2007, 26(9): 55-56
作者姓名:刘永
作者单位:江苏天能集团,龙固煤矿,江苏,徐州,221613
摘    要:龙固煤矿根据综采工作面安装的施工方法,通过科学地组织生产,简化施工环节,保证了施工质量,提前完成了任务,并一次试车成功,为今后综采工作面的安装积累了经验。

关 键 词:综采工作面  安装  施工方法
文章编号:1008-8725(2007)09-0055-02
修稿时间:2007-05-29

Installing Construction Method of Fully Mechanized Face in Longgu Coal Mine
LIU Yong. Installing Construction Method of Fully Mechanized Face in Longgu Coal Mine[J]. Coal Technology, 2007, 26(9): 55-56
Authors:LIU Yong
Affiliation:Longgu Coal Mine, Jiangsu Tianneng Group Corporation, Xuzhou 221613, China
Abstract:Acorrding to the installing construction method of the fully mechanized face in Longgu Coal Mine, through organizing production scientifically, simplifying the links in the construction chain, the construction quality is ensured, the job is finished ahead of time. It is successful to test run once. The experience is accumnlated for the installing of fully mechanized faces in future.
Keywords:fully mechanized face    installing    construction method