谈曲线段预应力混凝土连续箱梁施工技术
引用本文:贺喜萍.谈曲线段预应力混凝土连续箱梁施工技术[J].山西建筑,2011,37(35):162-164.
作者姓名:贺喜萍
作者单位:山西晋城路桥建设有限公司,山西晋城,048000
摘    要:结合具体工程实例,针对曲线段预应力混凝土连续箱梁施工技术进行了探讨,分别阐述了桥孔平面线形处理,弦弧差调整,墩顶连续端的处理,基桩坐标的确定等内容,以期指导今后同类工程,保证曲线段预应力混凝土箱梁平面线形美观。

关 键 词:曲线段  连续箱梁  平面线形  施工技术

On analysis of construction technique of prestressed concrete continuous box girder at curve section
HE Xi-ping.On analysis of construction technique of prestressed concrete continuous box girder at curve section[J].Shanxi Architecture,2011,37(35):162-164.
Authors:HE Xi-ping
Abstract:Combining with the factual project examples,the paper explores the construction technique of the prestressed concrete continuous box girder at curve section,illustrates the treatment of the plane alignment of bridge holes,the adjustment of chord and arc difference,and the treatment of the continuous ends of pier tops,and the identification of the coordinate of foundation piles,so as to direct the similar projects and ensure the beauty of the plane lines of the prestressed concrete continuous box girder at c...
Keywords:curve section  continuous box girder  plane linear  construction technique  