太平驿水电站地下厂房的快速施工
引用本文:杜亚玲. 太平驿水电站地下厂房的快速施工[J]. 水力发电, 1995, 0(12): 37-39,55
作者姓名:杜亚玲
作者单位:中国水利水电第十工程局
摘    要:太平驿水电站地下厂房由25个洞室群组成,具有尺寸大、洞室交叉多、锚喷量大和多设置岩壁吊车梁等特点,地下工程实际工期22.5个月,完成洞(明)挖、锚喷和2×125t桥吊,比合同工期提前2个月;59d完成了钢管安装816t;尾水工程比合同工期提前1年;工程质量优良;施工中无重大安全事故.通过这一大型而复杂的地下厂房施工,使水电十局深化了内部改革,提高了技术、管理水平,锻练了队伍,提高了企业综合实力.

关 键 词:水电站 地下式厂房 地下洞室 工程施工

The quickening construction of underground powerhouse in Taipingyi Hydropower Station
Du YaLing. The quickening construction of underground powerhouse in Taipingyi Hydropower Station[J]. Water Power, 1995, 0(12): 37-39,55
Authors:Du YaLing
Affiliation:China Tenth Hydroelectrical Engineering Bureau
Abstract:It was only taken four years and five months for the construction of Taipingyi Hydropower Station from starting to completion, which created a new record of the construction of hydropower in China. The quickening construction of underground powerhouse of the station provides a basis for this record. Meanwhile, it also is a result of common efforts by all the leaders and workers of China Tenth Hydroelectrical Engineering Bureau.
Keywords:Taipingyi Hydropower Station   underground powerhouse   quickening construction.  