羊卓雍湖抽水蓄能电站调压井施工
引用本文:谢方生.羊卓雍湖抽水蓄能电站调压井施工[J].水力发电,1995(11):7-8,14.
作者姓名:谢方生
作者单位:中国人民武装警察部队水电第三总队
摘    要:羊湖电站调压井为差动式结构,由竖井和上室组成,上室开挖采用分层梯段开挖和普通爆破方法。竖井开挖采用了临时混凝土衬护壁措施。竖井混凝土衬砌采用人工手拉戎芦提升滑模施工工艺,施工质量优良,节省了人力、木材,缩短了工期。上室混凝土浇筑,内井筒采用木模板,外井筒采用组合钢模板,混凝土外观质量好,外形尺寸准确。

关 键 词:抽水蓄能水电站  调压井  工程施工  开挖  衬砌

Construction of surge shaft in Yangzhuoyong Lake Hydropower Station
Xie Fangsheng.Construction of surge shaft in Yangzhuoyong Lake Hydropower Station[J].Water Power,1995(11):7-8,14.
Authors:Xie Fangsheng
Affiliation:Third Hydropower Development of Chinese Peoples Armed Police
Abstract:In Yangzhuoyong Lake Hydropower Station, the Surge shaft, a differential structure, is composed of vertical shaft and upper chamber. The excavation of upper chamber was conducted by the methods of bench excavating in layers and common explosion. The temporary concrete lining guard wall method was used in excavating vertical shaft. And The hand raising slip-form construction technique was adopted in the concrete lining for vertical shaft with good quality of construction, saving manpower and timber and shortening the comstruction period. In the concrete placement of the upper chamber, timber form was used in tile inner shaft wall and composite ateel form was used in the outer shaft wall so that a fine-looking concrete and accurate dimensions had been achieved.
Keywords:Yangzhuoyong Lakd Hydropower Station  surge shaft  excavation  lining  slip-form  