以发电为主的梯级电站龙头水库投资分摊问题初探
引用本文:林鸿.以发电为主的梯级电站龙头水库投资分摊问题初探[J].水力发电,1995(6):60-63,57.
作者姓名:林鸿
作者单位:昆明勘测设计研究院
摘    要:对于以发电为主的梯级水电站龙头水库对下游梯级电站的效益分摊问题,过去有几种不同的的计算方法。本文提出了的“替代效益增益增值比例分摊法”是以水电作为替代方案,计算必须容量和年发电量的综合效益,然后按照各级电站的增值进行分摊,是一种概念比较清楚的投资分摊方法。

关 键 词:梯级水电站  投资  经济效益

Preliminary study on cost share of the first station of the cascade hydropower stations
Lin Hong.Preliminary study on cost share of the first station of the cascade hydropower stations[J].Water Power,1995(6):60-63,57.
Authors:Lin Hong
Abstract:For Cascade hydropower stations with the main purpose of power genetation,there are several methods to divide the first cascade reservoir cost to be shared by the downstream stations. "Alternative benefit increment and value increment proportional dividing method" takes hydropower as an alternative benefit to calculate comprehensive benefit of rated capacity and annual output. Then the cost is divided according to benefits increase in each station.
Keywords:hydropower station  cascade development  the first reservoir  division of investment  