首页 | 本学科首页   官方微博 | 高级检索  
     

高预紧力全长锚固锚杆工况监测
引用本文:刘爱卿,鞠文君,衣宪章. 高预紧力全长锚固锚杆工况监测[J]. 煤炭工程, 2012, 0(3): 53-55
作者姓名:刘爱卿  鞠文君  衣宪章
作者单位:煤炭科学研究总院开采研究分院,北京100013;天地科技股份有限公司开采设计事业部,北京100013
基金项目:国家科技支撑计划课题(2008BAB36B07);天地科技工艺技术创新项目:弱胶结软岩巷道钻孔孔底快速扩孔锚固技术研究(KJ-JJ-2011-KCSJ-05)
摘    要: 通过对常用的测力锚杆改进,开发出了能够监测高预紧力全长锚固锚杆受力状况的CM-200Ⅰ型测力锚杆,并进行了实验室标定。同时开发出适用于测力锚杆施加扭矩的扭矩套筒,更好的实现了对高预应力全长锚固锚杆的实际工况监测。将改进后测力锚杆应用于井下,通过监测结果知高预紧力全长锚固锚杆的载荷在施加预紧力后沿杆体均匀分布,围岩变形后,在距锚杆尾部500mm处出现中性点,此处轴力最大,剪应力为零。并且根据巷道表面位移监测结果知高预紧力全长锚固锚杆有效的控制了顶板的变形,充分发挥了锚杆的支护性能

关 键 词:测力锚杆  高预紧力  全长锚固

Monitoring and Measuring on Performances of High Pre- Tensioned Full Length Anchoring Bolt
LIU Ai-qing , JU Wen-jun , YI Xian-zhang. Monitoring and Measuring on Performances of High Pre- Tensioned Full Length Anchoring Bolt[J]. Coal Engineering, 2012, 0(3): 53-55
Authors:LIU Ai-qing    JU Wen-jun    YI Xian-zhang
Affiliation:1,2(1.Mining and Design Branch,China Coal Research Institute,Beijing 100013,China; 2.Mining and Design Department,Tiandi Science and Technology Company Ltd.,Beijing 100013,China)
Abstract:With an improvement on the conventional force measuring bolt,a CM-200 I type force measuring bolt was developed to monitor and measure the stressed conditions of the high pre-tensioned full length anchoring bolt.A lab rating was conducted.Meanwhile,a torque socket to suitably add the torque to the force measuring bolt was developed and thus a actual performance monitoring and measuring of the high pre-stress full length anchoring bolt could be well conducted.The improved force measuring bolt was applied to the underground mine.The monitoring and measuring results showed that after the pre-tension made,the load on the high pre-tension full length anchoring bolt would be evenly distributed along the bar of the bolt.When the surrounding rock deformed,there would be a neutral point occurred at the 500mm to the bolt real end.A shaft force at the location would be max and the shearing stress would be zero.The support performances of the bolt could be fully played.
Keywords:force measuring bolt  high pre-tensioned  full length anchoring  bolt support
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《煤炭工程》浏览原始摘要信息
点击此处可从《煤炭工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号