首页 | 本学科首页   官方微博 | 高级检索  
     


Modeling and optimization of preparatory work and stoping in a coal mine panel
Authors:A. A. Ordin  A. M. Nikol’sky  A. A. Metel’kov
Affiliation:1. Chinakal Institute of Mining, Siberian Branch, Russian Academy of Sciences, Krasnyi pr. 54, Novosibirsk, 630091, Russia
Abstract:The problem on optimization of the prepration and stoping process variables based on the maximum discounted net revenue for the period of panel mining in a coal mine has been formualted and numerically solved. The optimized data are presented for the fully-mechanized production face in coal bed no. 19 in Kostromovskaya Mine. The authors also offer a new production face preparation scheme and illustrate its efficiency in terms of Kostromovskaya Mine.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号