西溪水库2005年大坝度汛方案研究
引用本文:吴春鸣. 西溪水库2005年大坝度汛方案研究[J]. 大坝与安全, 2005, 0(6): 7-9
作者姓名:吴春鸣
作者单位:华东勘测设计研究院,浙江,杭州,310014
摘    要:西溪水库工程大坝为碾压混凝土重力坝,由于前期人工骨料系统一直未能正常运行,导致2005年度汛面貌远未能达到计划要求。由此,参建各方针对年度度汛做了多方案探讨,本文即对度汛方案做了详细介绍。

关 键 词:西溪水库  碾压混凝土坝  施工期  度汛方案
文章编号:1671-1092(2005)06-0007-03
收稿时间:2005-11-09
修稿时间:2005-11-09

Study on the scheme of dam protection during flood in Xixi reservoir
WU Chun-ming. Study on the scheme of dam protection during flood in Xixi reservoir[J]. Large Dam & Safety, 2005, 0(6): 7-9
Authors:WU Chun-ming
Affiliation:WU Chun-ming//East China Investation and Design Institute
Abstract:The dam of Xixi reservoir project is RCC gravity dam,because the production system of artificial aggregates is not in good operation in the early construction time,the dam protection scheme during flood in 2005 did not reached the planned requirements,so the concerned parts studied and discussed several alternatives of the dam production during flood.This paper made a detail introduction on the dam protection scheme during flood.
Keywords:Xixi reservoir  RCC dam  construction period  dam protection scheme