首页 | 本学科首页   官方微博 | 高级检索  
     

应用二次长孔高压注水防突措施提高煤巷掘进速度
引用本文:张永忠.应用二次长孔高压注水防突措施提高煤巷掘进速度[J].煤炭技术,2008,27(1):136-137.
作者姓名:张永忠
作者单位:阳泉煤业公司,新景矿,山西,阳泉,045000
摘    要:在煤与瓦斯突出矿井的巷道施工中,防突措施的效果直接影响巷道掘进速度和施工安全,文中阐述了高压注水防突机理,并结合在新景矿芦南3#煤掘进煤巷施工中的效果检验,得出应用二次长孔高压注水防突措施在煤与瓦斯突出煤层煤巷掘进过程中的作用,对煤与瓦斯突出煤矿的煤巷掘进具有指导意义。

关 键 词:二次长孔高压注水  防突措施  掘进速度
文章编号:1008-8725(2008)01-0136-02
收稿时间:2007-09-25
修稿时间:2007-11-12

Application of the Secondary Slot High Pressure Water Injection Can Improve Excavating Velocity
ZHANG Yong-zhong.Application of the Secondary Slot High Pressure Water Injection Can Improve Excavating Velocity[J].Coal Technology,2008,27(1):136-137.
Authors:ZHANG Yong-zhong
Abstract:In the mine laneway with coal and gas outburst, outburst prevention measures determined excavating velocity and construction safety. The mechanism of secondary slot high pressure water injection was introduced in this article. Combine with the effect of this outburst prevention measure applicated in Lunan 3 # mine lane- way in Xinjing Cola mine, we concluded the important guidance function of secondary slot high pressure water injection in coal and gas outburst laneway.
Keywords:secondary slot high pressure water injection  outburst prevention measures  excavating velocity
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号