首页 | 本学科首页   官方微博 | 高级检索  
     

提高金堆城南露天钼矿石钼回收率浮选工艺试验研究
引用本文:万宏民,王海军,牛芳银,王勇海,严芳玲,徐秋生,俞国庆,钟在定.提高金堆城南露天钼矿石钼回收率浮选工艺试验研究[J].中国钼业,2012,36(6):20-24.
作者姓名:万宏民  王海军  牛芳银  王勇海  严芳玲  徐秋生  俞国庆  钟在定
作者单位:1. 西北有色地质研究院,陕西西安,710054
2. 金堆城钼业股份有限公司,陕西华县,714102
摘    要:在查明南北露天矿物组成、赋存状态等的基础上,针对南露天钼矿石钼品位低、石英含量高、辉钼矿粒度细等与北露天钼矿石性质有较大差异的特点,经过认真分析和详细的试验研究,认为选厂目前的一段再磨细度-400目85%~90%的磨浮流程不太适合南露天钼矿石,所获钼精矿品位和回收率均偏低,要取得较高品位和较高回收率的钼精矿,两段再磨浮选流程较为合理。

关 键 词:南露天钼矿石  两段再磨  强化浮选

STUDY ON FLOTATION PROCESS FOR RECOVERY IMPROVEMENT IN SOUTH OPEN-PIT MOLYBDENUM ORE
WAN Hong-min , WANG Hai-jun , NIU Fang-yin , WANG Yong-hai , YAN Fang-ling , XU Qiu-sheng , YU Guo-qing , ZHONG Zai-ding.STUDY ON FLOTATION PROCESS FOR RECOVERY IMPROVEMENT IN SOUTH OPEN-PIT MOLYBDENUM ORE[J].China Molybdenum Industry,2012,36(6):20-24.
Authors:WAN Hong-min  WANG Hai-jun  NIU Fang-yin  WANG Yong-hai  YAN Fang-ling  XU Qiu-sheng  YU Guo-qing  ZHONG Zai-ding
Affiliation:WAN Hong - min1,WANG Hai -jun1,NIU Fang - yin1,WANG Yong - hai1, YAN Fang - ling2,XU Qiu - sheng2,YU Guo - qing2,ZHONG Zai - ding2 (1.Northwest Geological Institute of Nonferrous Metals,Xian 710054,Shaanxi,China) (2.Jinduicheng Molybdenum Co.,Ltd.,Huaxian 714102,Shaanxi,China)
Abstract:By ascertaining the north and south open - pit mineral composition, occurrence state, and etc. , it is found that the characteristics of the south open - pit molybdenum ore are different from that of north open - pit mo- lybdenum ore. The grade of the south open - pit molybdenum ore is lower, the content of quartz is higher, and the particle size of the molybdenites is finer than that of the north open - pit molybdenum oreg. By serious analysis and detailed study, we think that regrinding fineness -400 mesh 85% -90% floatation grinding process in the dress- ing plant is not really fit for south open - pit molybdenum ore , because the grade and recovery of the molybdenum concentrate are low. If the dressing plant wants to get higher grade and recovery of the molybdenum concentrates, two- section regrinding flotation process will be reasonable.
Keywords:south open- pit molybdenum ore  two -section regrinding  intensive flotation
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号