摘    要:泸定水电站坝基覆盖层最大深度超过150m,坝基防渗处理采用110m深混凝土防渗墙下接4排帷幕灌浆方案,存在地层复杂、造孔深度大、高陡坡嵌岩、混凝土浇筑及墙段接头孔拔管成孔等难点.介绍施工平台及导墙施工、槽段划分、造孔、泥浆制备、钢筋笼和预埋管制安、墙段连接及混凝土浇筑等关键施工艺.检测结果证明该防渗墙强度、抗渗性等指标均满足要求.

关 键 词:泸定水电站  坝基  混凝土防渗墙  施工技术  质量检验

Construction Technology of Over 100m Depth Concrete Cut-off Wall in Luding Hydropower Station
Yang Wei. Construction Technology of Over 100m Depth Concrete Cut-off Wall in Luding Hydropower Station[J]. Construction Technology, 2010, 39(5)
Authors:Yang Wei
Affiliation:Yang Wei (SINOHYDRO Foundation Engineering Co.,Ltd.,Tianjin 301700,China)
Abstract:The deepest covering layer under foundation of Luding Hydropower Station is more than 150m. Construction sheme of 110m depth concrete cut-off wall combining with 4 rows of curtain grouting is adopted for anti-seepage treatment of the dam foundation according to difficulties such as complex geological conditions,deep holes,high and steep slope rock-socketing,concrete pouring,as well as pulling pipes out of joint holes of wall segments and holes forming. Key construction technologies are introduced,including ...
Keywords:Luding Hydropower Station  dam foundation  concrete cut-off wall  construction technology  quality inspection  