工程建设进度失控的成因及对策浅析
引用本文:陈昌礼.工程建设进度失控的成因及对策浅析[J].贵州水力发电,2003,17(4):65-67.
作者姓名:陈昌礼
作者单位:国家电力公司贵阳勘测设计研究院,贵州,贵阳,550002
摘    要:文中分析了工程建设进度失控的主要原因:有业主的,有设计单位的,有施工单位的,也有监理工程师的。并在此基础上针对性地提出了减少进度失控的6项对策,包括科学确定工期、优选施工单位、尽早委托监理工程师、强化合同意识、重视设计单位的现场服务及实行计算机辅助监理等。

关 键 词:土木建筑工程施工  建设工期  进度失控成因  对策
文章编号:1007-0133(2003)04-0065-03
修稿时间:2003年4月3日

Preliminary Analysis on Formation Causes & Countermeasures of Schedule Delay in Engineering Construction
CHEN Chang-li.Preliminary Analysis on Formation Causes & Countermeasures of Schedule Delay in Engineering Construction[J].Guizhou Water Power,2003,17(4):65-67.
Authors:CHEN Chang-li
Abstract:The paper analyzes the main causes of schedule delay in engineering construction, they are concerned with owner, designer, constructor as well as supervisor. On the base of analysis, the writer presents six counter-measures to strengthen controlling progress. They include the measures such as scientifically determining schedule, selecting the best construction company, entrusting supervisor as early as possible, strengthening contract sense, attaching importance to sit service of designer, as well as carrying out computer aid supervision and etc.
Keywords:civil engineering construction  construction schedule  cause of schedule delay  countermeasure  