首页 | 本学科首页   官方微博 | 高级检索  
     

橡胶坝塌坝最大泄流量快速估算方法
引用本文:张靖,沈欣菲,周升龙,李雪梅,张庆华.橡胶坝塌坝最大泄流量快速估算方法[J].长江科学院院报,2020,37(4):62-66.
作者姓名:张靖  沈欣菲  周升龙  李雪梅  张庆华
作者单位:1.山东农业大学 水利土木工程学院,山东 泰安 271018;2.泰安市水利局,山东 泰安 271000
基金项目:长江科学院开放研究基金资助项目(CKWV2018460/KY);山东省重大水利科研与技术推广项目 (SDSLKY201233)
摘    要:橡胶坝塌坝产生的最大泄流量是汛期橡胶坝控制运用的关键,为了快速准确地计算橡胶坝塌坝产生的最大泄流量,依据橡胶坝坝高、河道比降、蓄水量、坝长及塌坝时间等因素组合了102个塌坝方案,模拟计算了塌坝产生的最大泄流量。分析表明,橡胶坝塌坝产生的最大泄流量与坝长、蓄水量、河道坡度、坝高、塌坝时间等因素有关。在此基础上,利用统计分析方法建立了橡胶坝塌坝产生的最大泄流量估算经验公式,该公式包括了蓄水量、塌坝时间、坝长、坝高、侧收缩系数等因素。经验证该公式具有快速、准确的特点,方便实用。

关 键 词:塌坝泄流  最大泄流量  塌坝方案  快速估算  大坝控制运用  橡胶坝  
收稿时间:2019-01-21

Fast Estimation Method for Maximum Discharge of Rubber Dam Collapse
ZHANG Jing,SHEN Xin-fei,ZHOU Sheng-long,LI Xue-mei,ZHANG Qing-hua.Fast Estimation Method for Maximum Discharge of Rubber Dam Collapse[J].Journal of Yangtze River Scientific Research Institute,2020,37(4):62-66.
Authors:ZHANG Jing  SHEN Xin-fei  ZHOU Sheng-long  LI Xue-mei  ZHANG Qing-hua
Affiliation:1.College of Water Conservancy and Civil Engineering, Shandong Agricultural University, Tai'an 271018, China;2.Water Resources and Fishery Bureau of Tai'an, Tai'an 271000, China
Abstract:The maximum discharge generated by the collapse of rubber dam is crucial for the control and running of rubber dam in flood season. To calculate the maximum discharge caused by rubber dam collapse quickly and accurately, 102 scenarios of rubber dam collapse were designed to simulate the maximum discharge caused by dam collapse. Dam height, river slope, water storage, length of dam, and dam collapse duration and other factors were selected as variables in the scenarios. The empirical formula for estimating the maximum discharge generated by the collapse of rubber dam involving dam length, dam height, water storage, complete dam collapse duration, and lateral contraction coefficient was presented using statistical analysis method. Example verification demonstrate that the empirical formula is quick in calculating and accurate in result, and also practical and convenient.
Keywords:discharge of dam collapse  maximum discharge  dam collapse scheme  fast estimation  controlled operation of dam  rubber dam  
本文献已被 CNKI 等数据库收录!
点击此处可从《长江科学院院报》浏览原始摘要信息
点击此处可从《长江科学院院报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏