首页 | 本学科首页   官方微博 | 高级检索  
     

300MW火电厂灰场坝体变形观测设计方案
引用本文:徐佳早. 300MW火电厂灰场坝体变形观测设计方案[J]. 安徽水利水电职业技术学院学报, 2014, 14(1): 11-13
作者姓名:徐佳早
作者单位:田家庵发电厂,安徽淮南,232007
摘    要:文章通过对某发电厂贮灰场坝体变形观测,介绍了变形观测基准网和监测网的布网、施测细则、质量保证措施、工艺流程和方案设计情况.

关 键 词:灰场大坝  变形  测量  控制网

The designs of deformation observation for 300MW Power Plant Ash dam
XU Jia-zao. The designs of deformation observation for 300MW Power Plant Ash dam[J]. Journal of Anhui Technical College of Water Resources and Hydroelectric Power, 2014, 14(1): 11-13
Authors:XU Jia-zao
Affiliation:XU Jia-zao (Tianjiaan Power Plant, Huainan 232007,China)
Abstract:Based on a power plant ash ponds dam deformation monitoring, this paper introduces the deformation observation network and monitoring network benchmark distribution network, sampling conditions, quality assurance measures, process and program design, as well as deformation of the dam monitoring understanding and experience.
Keywords:ash field dam  deformation  measurement  control network
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号