摘    要:地壳上层岩体的应力状态是地壳最重要的性质之一,获取岩体应力状态最直接、可靠的手段是原位地应力测量.首先简要回顾地应力测量的研究历程及其发展现状,分析岩石力学与工程中常用的几种地应力测量方法和技术.重点介绍钻孔局部壁面应力解除法(BWSRM)这一新的三维地应力测量方法的原理,以及基于BWSRM的地应力测井机器人研制过程和...

关 键 词:岩石力学  地应力  三维地应力测量  应力解除法
收稿时间:2011-09-28;

A NEW 3D IN-SITU ROCK STRESS MEASURING METHOD:BOREHOLE WALL STRESS RELIEF METHOD(BWSRM) AND DEVELOPMENT OF GEOSTRESS MEASURING INSTRUMENT BASED ON BWSRM AND ITS PRIMARY APPLICATIONS TO ENGINEERING
GE Xiurun,HOU Mingxun.A NEW 3D IN-SITU ROCK STRESS MEASURING METHOD:BOREHOLE WALL STRESS RELIEF METHOD(BWSRM) AND DEVELOPMENT OF GEOSTRESS MEASURING INSTRUMENT BASED ON BWSRM AND ITS PRIMARY APPLICATIONS TO ENGINEERING[J].Chinese Journal of Rock Mechanics and Engineering,2011,30(11):2161-2180.
Authors:GE Xiurun  HOU Mingxun
Affiliation:(1. State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,Wuhan,Hubei 430071,China;2. Institute of Geotechnical Engineering,Shanghai Jiaotong University,; Shanghai 200240,China)
Abstract:It is important to conduct a research on the stress state of the rock masses in the upper earth′s crust. In-situ rock stress measurement is the basic and reliable access to obtain the stress state of the rock masses. The development of in-situ rock stress measurement and state-of-art of research on it are overviewed. Then,several in- situ rock stress measuring methods and techniques are briefly analyzed in rock mechanics and engineering. A new method,borehole wall stress relief method(BWSRM) to determine the in-situ 3D rock stress tensor in a single drilled borehole is deliberated. An original geostress measuring instrument typed by BWSRM-H01 is designed and manufactured based on the principle of in-situ rock stress measurement with BWSRM. The in-situ test for rock stress with BWSRM is carried out at an experimental tunnel in Jinping II hydropower station,China,where the buried depth of overburden is about 2 430 m. It is shown that the two principal stress components close to the horizontal direction are the maximum and intermediate principal stress respectively;while the stress component close to vertical direction is just the minor principal stress in the testing site. The magnitudes of the maximum and the intermediate principal stress are high;and both of them are very close.
Keywords:rock mechanics  in-situ rock stresses  3D in-situ rock stress measurements  stress relief method  
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《岩石力学与工程学报》浏览原始摘要信息
点击此处可从《岩石力学与工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号