那力水电站优化设计
引用本文:冯武龙,闫英. 那力水电站优化设计[J]. 广西水利水电, 2004, 0(1): 27-29
作者姓名:冯武龙  闫英
作者单位:1. 广西百色市澄碧河水库管理局,广西,百色,533000
2. 广西百色水利电力设计院,广西,百色,533000
摘    要:简述那力水电站原设计方案,针对其不足,结合地形、地质条件,对引水隧洞、压力前池、泄水陡坡进行优化设计,优化后节省工程投资200万元,效果良好。

关 键 词:那力水电站 优化设计 引水隧洞 压力前池 泄水陡坡 引水式水电站
文章编号:1003-1510(2004)01-0027-03
修稿时间:2003-09-04

The Nali hydropower station optimum design
FENG Wu-long,YAN Ying. The Nali hydropower station optimum design[J]. Gx Water Resources & Hydropower Engineering, 2004, 0(1): 27-29
Authors:FENG Wu-long  YAN Ying
Affiliation:FENG Wu-long~1,YAN Ying~2
Abstract:Briefly discussed the original design scheme of the Nali power station,in view of its shortage, combining with the topography and geologic condition, the conduit tunnel, pressure pool and discharging slope were optimum designed, saved project investion 2 million yuan and the effect was well.
Keywords:the Nali power station  optimum  design