首页 | 本学科首页   官方微博 | 高级检索  
     

轴伸贯流式水轮发电机组的轴线调整
引用本文:胡宝玉.轴伸贯流式水轮发电机组的轴线调整[J].西北水电,2006(4).
作者姓名:胡宝玉
作者单位:中国水电十五局,西安,710075
摘    要:传统的卧式机组盘车方法有些在施工现场实施比较困难,有些轴线偏差量的计算公式推导繁琐,安装工人不易掌握。经过对一些卧式机组盘车的实践,以轴伸贯流式水轮发电机组盘车为例,介绍一种简单易行的盘车方法。

关 键 词:轴伸贯流式  水轮发电机组  轴线调整

Axial alignment of shaft - extension tubular turbogenerator units
HU Bao-yu.Axial alignment of shaft - extension tubular turbogenerator units[J].Northwest Water Power,2006(4).
Authors:HU Bao-yu
Abstract:It is rather difficult to install traditional horizontal units by barring at some construction sites,and also it is not easy for erectors to use the formulae to calculate axial deviation.Through practices,a sort of simple method is presented to barring shaft-extension tubular turbogenerator unit.
Keywords:shaft-extension tubular turbogenerator unit  axial alignment
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号