首页 | 本学科首页   官方微博 | 高级检索  
     

长井段水平井油管输送式射孔管柱防卡技术
引用本文:焦建国,张庆生,赵开良,孙兴宇.长井段水平井油管输送式射孔管柱防卡技术[J].断块油气田,2013,20(3):403-405.
作者姓名:焦建国  张庆生  赵开良  孙兴宇
作者单位:1. 中国石化集团中原石油勘探局地球物理测井公司,河南濮阳,457001
2. 中国石化中原油田普光分公司,四川达州,636156
基金项目:国家科技重大专项"高含硫气藏安全高效开发技术"
摘    要:水平井油管输送式射孔后,管柱遇卡的现象时有发生。长井段水平井油管输送式射孔时,由于射孔器串长,射孔后管柱遇卡的风险更高。文中结合PG气田DW区块地质特点,针对造成射孔管柱遇卡的主要原因,通过设计适合DW区块地质特点的关键射孔参数、研发低碎屑射孔弹、制定射孔管柱扶正措施等。降低了长井段水平井油管输送式射孔管柱遇卡的风险,该技术在PG气田DW区块4口超长井段水平井的射孔施工中应用,射孔一次成功率100%,射孔后管柱上提摩阻在正常范围内

关 键 词:水平井  长井段  射孔  传爆  射孔管柱

Anti-stuck technology for tubing-conveyed perforating string in horizontal well with long perforating interval
Jiao Jianguo , Zhang Qingsheng , Zhao Kailiang , Sun Xingyu.Anti-stuck technology for tubing-conveyed perforating string in horizontal well with long perforating interval[J].Fault-Block Oil & Gas Field,2013,20(3):403-405.
Authors:Jiao Jianguo  Zhang Qingsheng  Zhao Kailiang  Sun Xingyu
Affiliation:1.Geophysical Wireline Logging Company, Zhongyuan Petroleum Exploration Bureau, SINOPEC, Puyang 457001, China; 2.Puguang Branch of Zhongyuan Oilfield Company, SINOPEC, Dazhou 636156, China)
Abstract:Daring tubing-conveyed perforatin (TCP) operations in horizontal wells stuck of pipe string after firing is likely happened. For TCP operations in horizontal wells with hmg perforating intervals, the probability of stuck of pipe string is greater because of the extreme long perfurator string. Combined with the geological characteristics uf DW Block in PG Gas Field, the research is performed on the main factors causing the stuck. Through selecting appropriate key perforating parameter, researching and developing low debris perfurating charges and taking centralizing measures of perforating string, the risk of stuck during TCP operations in horizontal wells with long perforating intervals is greatly reduced. While being utilized in TCP operations for 4 horizontal wells with extra-long perforating interval in DW Block of PG Gas Field, one-time success rate of TCP was 100%. After firing, the friction of pipe string while pulling out was within normal range. For horizontal wells with long perforating intervals, reasonable perforating parameters, low debris perforating charges and other technical measures can effectively prevent perforator string from getting stuck after firing.
Keywords:horizontal well  long interval  perforation  explosion propagation  perforating string
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号