首页 | 本学科首页   官方微博 | 高级检索  
     

集中供热管网工程井室逆作法施工方案设计
引用本文:周,彬.集中供热管网工程井室逆作法施工方案设计[J].山西建筑,2014(23):137-138.
作者姓名:  
作者单位:太原市热力公司,山西太原030012
摘    要:结合集中供热管网工程井室逆作法施工设计方案,详细阐述了井室逆作法施工过程中土方开挖、冠梁施工、混凝土浇筑等各个施工工序的主要内容,总结了施工过程中需注意的事项,为供热工程施工积累了经验。

关 键 词:逆作法  施工技术  效益

The construction scheme design of well chamber reverse construction method of central heating pipe network engineering
ZHOU Bin.The construction scheme design of well chamber reverse construction method of central heating pipe network engineering[J].Shanxi Architecture,2014(23):137-138.
Authors:ZHOU Bin
Affiliation:ZHOU Bin (Taiyuan Heating Power Company, Taiyuan 030012, China)
Abstract:Combining with the construction scheme design of well chamber reverse construction method of central heating pipe network engineer-ing,this paper elaborated in detail the main contents of soil excavation,crown beam construction,concrete pouring and each construction process in well chamber reverse construction method,summarized the matters needing attention in construction process,accumulated experience for heat supply engineering construction.
Keywords:reverse construction method  construction technology  benefit
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号