首页 | 本学科首页   官方微博 | 高级检索  
     

长山大桥主桥施工控制技术研究
引用本文:水玉龙,孙建渊,许建. 长山大桥主桥施工控制技术研究[J]. 山西建筑, 2014, 0(26): 176-178
作者姓名:水玉龙  孙建渊  许建
作者单位:同济大学桥梁工程系
摘    要:通过建立以自适应控制方法为核心的施工控制体系,对长山大桥的施工控制技术进行了研究,解决了大跨径预应力混凝土矮塔斜拉桥施工控制的技术难题,实现了该桥的顺利合龙。

关 键 词:矮塔斜拉桥  施工控制  控制内容  成果分析

Research on the construction control technology of Changshan bridge
SHUI Yu-long;SUN Jian-yuan;XU Jian. Research on the construction control technology of Changshan bridge[J]. Shanxi Architecture, 2014, 0(26): 176-178
Authors:SHUI Yu-long  SUN Jian-yuan  XU Jian
Affiliation:SHUI Yu-long;SUN Jian-yuan;XU Jian;Department of Bridge Engineering,Tongji University;
Abstract:Through the establishment of the construction control system with adaptive control method as the core,the construction control technol-ogy of the Changshan bridge was studied to solve the technical problems that how to implement the construction control of the prestressed concrete extra-dosed cable-stayed bridge with long span,leading to smooth closure of this bridge.
Keywords:extra-dosed cable-stayed bridge construction control control content analysis of results
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号