首页 | 本学科首页   官方微博 | 高级检索  
     

北京市某大学地埋管换热器施工工艺探讨
引用本文:程玉金,陈洪安,张杰,王敬修. 北京市某大学地埋管换热器施工工艺探讨[J]. 建筑热能通风空调, 2011, 30(4): 93-95
作者姓名:程玉金  陈洪安  张杰  王敬修
作者单位:1. 装备指挥技术学院基建办,101416
2. 中机十院国际工程有限公司
3. 北京天福昌运制冷设备安装有限公司
摘    要:本文介绍了北京市某大学地源热泵空调系统中地埋管换热器部分施工的全过程,重点讨论山区室外打井及回填工艺中所遇到的技术难点和解决办法。各项数字表明,岩石层地源井与砂粘土层地源井比较起来,其导热系数要高出3倍左右。该项目的成功实施填补在山区推行地源热泵技术的空白。

关 键 词:地源热泵  钻孔  回填工艺

Discussion on Construction of Buried Pipeline for Ground Source Heat Pump Air-conditioning System in a University of Beijing
CHENG Yu-jin,CHEN Hong-an,ZHANG Jie,WANG Jing-xiu Infrastructure Management Department,Academy of Equipment Comm, , Technology China Machinery TDI International Engineering Co.Ltd. Discussion on Construction of Buried Pipeline for Ground Source Heat Pump Air-conditioning System in a University of Beijing[J]. Building Energy & Environment, 2011, 30(4): 93-95
Authors:CHENG Yu-jin  CHEN Hong-an  ZHANG Jie  WANG Jing-xiu Infrastructure Management Department  Academy of Equipment Comm   & Technology China Machinery TDI International Engineering Co.Ltd
Affiliation:CHENG Yu-jin1,CHEN Hong-an1,ZHANG Jie2,WANG Jing-xiu3 1 Infrastructure Management Department,Academy of Equipment Command & Technology 2 China Machinery TDI International Engineering Co.Ltd. 3 Beijing Tianfu Changyun Refrigeration Equipment Installation Co.Ltd.
Abstract:The construction of a ground source heat pump air-conditioning system in a University of Beijing was introduced in detail,focused on the technical difficulties and solutions of the mountain and filling processes of outdoor wells.The figures show that the rock layers in the source well and sandy clay layer of ground source wells in comparison,its thermal conductivity to be higher than 3 times.The successful implementation of the project filled the gaps in the field of the ground source heat pump technology i...
Keywords:ground source heat pump  vertical drilling  filling process  
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号