Computing Completion Time and Optimal Scheduling of Design Activities in Concurrent Product Development Process
Authors:Hong-Sen Yan Bin Wang Duo Xu Zheng Wang
Affiliation:Key Lab. of Meas. & Control of Complex Syst. of Eng., Southeast Univ., Nanjing, China;
Abstract:This paper proposes a time-computing model and a scheduling method for shortening the completion time of product development under the given rework cost budget. As overlapping and iteration exist between or among design activities in concurrent product development, predictability and efficiency of the process deserve attention. By using the corresponding design structure matrix, the characteristics of information flow are obtained and applied to analysis of the dynamic behavior of the product development process. A time-computing model is set up to estimate the rework cost and completion time of each of the activities, between which both iteration and overlapping are observed. Through sequential quadratic programming, an optimization algorithm is developed for minimizing the development completion time under the constraint of the given rework cost budget. Our application results acquired from our experiments have verified the feasibility and validity of the approach.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号