湾坝河水电站软基加固中的振冲施工技术
引用本文:邹刚. 湾坝河水电站软基加固中的振冲施工技术[J]. 水力发电, 2006, 32(7): 42-44
作者姓名:邹刚
作者单位:中国水利水电第七工程局,四川,郫县,611730
摘    要:湾坝河水电站闸基坐落在第四纪砂砾石覆盖层上,属于软基上建闸。为了确保闸坝基础能满足坝基稳定、承载、变形的要求,设计上采用了振冲法对覆盖层进行加固处理。该工程振冲加固技术的施工方法、技术措施、质量控制措施可供类似工程参考。

关 键 词:软基加固 漂砾石层 振冲法 湾坝河水电站
文章编号:0559-9342(2006)07-0042-03
收稿时间:2005-12-30
修稿时间:2005-12-30

The Vibration & Impulsion Treatment of Soft Foundation of Wanbahe Power Station
Zou Gang. The Vibration & Impulsion Treatment of Soft Foundation of Wanbahe Power Station[J]. Water Power, 2006, 32(7): 42-44
Authors:Zou Gang
Affiliation:The Seventh Water Conservancy and Hydropower Engineering Bureau of China, Pixian Sichuan 611730
Abstract:The foundation of gated-weir of the Wanbahe Power Station is located on Quaternary deposit which is soft.In order to meet the requirement of stability,loading and the distortion of the dam,the technique of vibration & impulsion was adopted to reinforce the overburden layer.This reinforcement technique and its quality control are applicable to project of similar nature.
Keywords:Soft foundation reinforcement  quaternary deposit  technique of vibration & impulsion  Wanbahe Power Station