首页 | 本学科首页   官方微博 | 高级检索  
     

朝阳寺隧道下穿既有高速公路段监控量测技术
引用本文:刘彦波,蒋树屏,魏清华. 朝阳寺隧道下穿既有高速公路段监控量测技术[J]. 山西建筑, 2008, 34(14): 317-319
作者姓名:刘彦波  蒋树屏  魏清华
作者单位:1. 重庆交通大学,重庆,400074
2. 重庆交通科研设计院,重庆,400067
3. 重庆市交通规划勘察设计院,重庆,400032
摘    要:介绍了朝阳寺隧道的工程概况,阐述了朝阳寺隧道下穿既有高速公路段的监控量测技术,并对监控量测成果进行了分析,得出了相关结论,为隧道的施工监测积累了经验,具有一定的参考价值。

关 键 词:隧道  高速公路  监控量测  断面布置
文章编号:1009-6825(2008)14-0317-03
修稿时间:2008-01-21

Technique of monitoring and measurement to highway section fixed in tunnel underside of Zhaoyang temple
LIU Yan-bo,JIANG Shu-ping,WEI Qing-hua. Technique of monitoring and measurement to highway section fixed in tunnel underside of Zhaoyang temple[J]. Shanxi Architecture, 2008, 34(14): 317-319
Authors:LIU Yan-bo  JIANG Shu-ping  WEI Qing-hua
Affiliation:LIU Yan-bo JIANG Shu-ping WEI Qing-hua
Abstract:The paper introduces the engineering situation of tunnel of Zhaoyang temple.Elaborates a kind technique of monitoring and measurement just as highway section is used in the tunnel underside of Zhaoyang temple.Meanwhile,it also analyzes the achievement obtained from monitoring and measurement,and then reaches a relevant conclusion,which cumulates enough experience for construction monitoring of the tunnel,and has some value for reference.
Keywords:tunnel  highway  monitoring and measurement  setting of cross section
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号