摘    要:水轮发电机定子下线的流程和工艺各制造厂家都有要求,但是对于电站施工现场的一些特殊情况、处理方法及注意事项并没有作出详细的说明。作者就多年在现场实际工作经验、施工中易出现的问题和应注意事项作简单的阐述,以供参考。

关 键 词:水轮发电机  定子  下线流程  工艺

Process and technical characteristics of field assembling of stators for turbine-generator units
JIANG Bao-jun. Process and technical characteristics of field assembling of stators for turbine-generator units[J]. Northwest Water Power, 2010, 0(3): 71-74
Authors:JIANG Bao-jun
Affiliation:JIANG Bao-jun (Northwest Hydro Consulting Engineers, CHECC, Xi'an 710065, China)
Abstract:Although manufacturers have requirements on the process and technology for assembling of stators of turbine-generator units, special conditions, treatment method and cautions at construction site are not specified. Based on many years of experience, this paper presents the problems easily occurred in construction and provides reference.
Keywords:turbine-generator unit  stator  assembling process  technology