首页 | 本学科首页   官方微博 | 高级检索  
     

乐滩水库引水灌区工程移民生产安置浅析
引用本文:陆山. 乐滩水库引水灌区工程移民生产安置浅析[J]. 广西水利水电, 2006, 0(4): 92-93
作者姓名:陆山
作者单位:广西水利电力勘测设计研究院,南宁,530023
摘    要:在调查乐滩水库引水灌区移民数量及其生产生活水平和拆迁面积的基础上,采用系统分析方法进行移民环境容量分析,确定移民安置区可容纳的移民人数.根据灌区实际情况,提出了生产安置标准和生产开发项目,确保移民生活水平达到规划目标值,与所在地区同步发展.

关 键 词:移民安置  生产安置  环境容量  乐滩水库灌区
文章编号:1003-1510(2006)04-0092-02
修稿时间:2006-08-30

Production resettlement for inhabitants in Letan reservoir irrigation area
LU Shan. Production resettlement for inhabitants in Letan reservoir irrigation area[J]. Gx Water Resources & Hydropower Engineering, 2006, 0(4): 92-93
Authors:LU Shan
Abstract:Based on an investigation of the population,production and living standard of inhabitants to be resettled,the area of pulling down and rebuilding residence as a result of construction of Letan reservoir irrigation project,resettlement environment capacity was analyzed by systems analysis method,the population of inhabitants which the resettlement area can accept was determined.According to the actual conditions of irrigation area,the production resettlement standard and production development project are put forward aiming to ensure the living standard of the resettled inhabitants is up to the planned objective and the resettled zone will develop synchronously with the site.
Keywords:Inhabitant resettlement  production resettlement  environment capacity  Letan reservoir irrigation area
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号