西永线HJGU换位铁塔组立施工方法
引用本文:杨记宁,罗高亮. 西永线HJGU换位铁塔组立施工方法[J]. 青海电力, 2010, 29(3): 32-34
作者姓名:杨记宁  罗高亮
作者单位:青海送变电工程公司,青海西宁810001
摘    要:西永线是青海省第一条采用750 kV同塔双回路的输电线路工程,HJGU换位铁塔整体重量大,尤其是上导线横担长且重。HJGU换位铁塔上导线横担换位架的吊装是铁塔组立施工的关键,文章对铁塔换位架的吊装方法进行了介绍。

关 键 词:HJGU换位铁塔  组立  施工

Construction Method Discussion of HJGU Transposition Tower Assembling and Erection in Xining-Yongdeng Line
YANG Ji-ning,LUO Gao-liang. Construction Method Discussion of HJGU Transposition Tower Assembling and Erection in Xining-Yongdeng Line[J]. Qinghai Electric Power, 2010, 29(3): 32-34
Authors:YANG Ji-ning  LUO Gao-liang
Affiliation:YANG Ji-ning,LUO Gao-liang
Abstract:Xining-Yongdeng line is a first transmission line project of using 750kV double circuit on the same tower in Qinghai province.The feature of HJGU transposition tower is overall heavy weight,particularly the cross-arm on the wires length and weight,lifting of transposition frame on the wires is the key construction of tower assembling and erection,the paper discusses the lifting method of transposition frame on transposition tower.
Keywords:HJGU transposition tower  assembling and erection  construction