白水江流域后续水电站开发顺序的选择
引用本文:欧俊峰.白水江流域后续水电站开发顺序的选择[J].四川水力发电,2007,26(2):12-13,32.
作者姓名:欧俊峰
作者单位:九寨沟水电开发有限责任公司,四川,成都,610072
摘    要:白水江流域规划开发七级电站,总装机容量53.7万kW,目前已开发完成黑河塘电站,双河电站正在建设中,后续五个电站中的多诺和青龙电站具备开工条件。在白水江水电开发现状的基础上,结合整个电力市场,对两个电站开发的先后顺序进行了分析。

关 键 词:白水江  后续电站  开发顺序  选择
文章编号:1001-2184(2007)02-0012-02
修稿时间:2007-03-08

Selection of Development Sequence of The Following Hydropower Stations in Baishuijiang River Basin
OU Jun-feng.Selection of Development Sequence of The Following Hydropower Stations in Baishuijiang River Basin[J].Sichuan Water Power,2007,26(2):12-13,32.
Authors:OU Jun-feng
Abstract:Seven staged hydropower stations with total installed capacity of 537MW are planned to be developed in Baishuijiang River Basin. The Heihetang hydropower station development is completed presently, the Shuanghe hydropower station is under construction . The Duonuo and Qinglong hydropower stations are ready to be constructed in the Following 5 hydropower projects. In this paper, development sequence of the latter two hydropower stations are studied based on current conditions of Baishuihe River Basin Development and entire power market condition.
Keywords:Baishuihe  Following hydropower stations  development sequence  selection