首页 | 本学科首页   官方微博 | 高级检索  
     

新安江水电厂水轮机进相试验研究
引用本文:郑贤喜,周尚东,尹熙. 新安江水电厂水轮机进相试验研究[J]. 西北水电, 2009, 0(5): 57-60
作者姓名:郑贤喜  周尚东  尹熙
作者单位:新安江水力发电厂,浙江省建德市,311608
摘    要:水轮发电机适时进相运行,能改善和抑制电网电压水平。通过对新安江水力发电厂4号机进相试验研究,指出发电机静稳极限、厂用电电压、定子端部结构件温升是发电机进相运行的主要限制条件。进相试验确定低励限制的范围,提高水轮发电机的进相运行能力。

关 键 词:发电机  进相试验  电压调节  试验研究

Phase-advance test and research on turbines of Xin'anjiang hydropower plant
ZHENG Xian-xi,ZHOU Shang-dong,YIN Xi. Phase-advance test and research on turbines of Xin'anjiang hydropower plant[J]. Northwest Water Power, 2009, 0(5): 57-60
Authors:ZHENG Xian-xi  ZHOU Shang-dong  YIN Xi
Affiliation:Xin'anjiang Hydropower Plant;Jiande 311608;China
Abstract:Timely phase-advance operation of turbine-generators can improve and suppress the grid voltage level.Through phase-advance test and research on No.4 Unit of Xin'anjiang hydropower plant,it shows that the static stability limit of generator,service power voltage and temperature rise of stator end elements are the main constraints for phase-advance operation of generators.The phase-advance test can determine the range of low excitation limit and improve the phase-advance operation capability of turbine-genera...
Keywords:generator  phase-advance test  voltage regulation  test research  