首页 | 本学科首页   官方微博 | 高级检索  
     

地下矿山生产接续与设备调度集成优化模型
作者姓名:李国清  侯杰  胡乃联
作者单位:北京科技大学土木与资源工程学院,北京100083;金属矿山高效开采与安全教育部重点实验室,北京100083;北京科技大学土木与资源工程学院,北京100083;金属矿山高效开采与安全教育部重点实验室,北京100083;北京科技大学土木与资源工程学院,北京100083;金属矿山高效开采与安全教育部重点实验室,北京100083
基金项目:国家自然科学基金资助项目(71573012)
摘    要:为了实现地下金属矿山生产接续的紧凑性、科学高效地调度生产设备,针对矿山开采工序复杂、设备资源有限、生产任务量大等特点,以最短工序时间间隔和最短总完成时间为共同优化目标构建了地下矿山生产接续与设备调度集成优化模型.通过分析地下矿山生产循环顺序、作业设备类型和生产能力等生产要素,考虑工序闲置期间采场的安全隐患问题,运用改进遗传算法对最优解进行主-从两步骤搜索,得到地下矿山生产接续和设备调度最佳方案.以国内某大型金矿为案例进行了模型的有效性验证,解算出矿山最优的设备调度计划.验证结果表明,与传统的单一目标优化相比,模型在保证完成指定任务的同时,有效缩短工序时间间隔,并且保证了作业的安全要求. 

关 键 词:地下金属矿山  集成优化  生产接续  设备调度  改进遗传算法
收稿时间:2018-04-16

Integrated optimization model for production and equipment dispatching in underground mines
Affiliation:1) School of Civil and Resource Engineering, University of Science and Technology Beijing, Beijing 100083, China2) Key Laboratory of High-Efficient Mining and Safety of Metal Mines, Ministry of Education, Beijing 100083, China
Abstract:Integrated optimization of production plays a key role in realizing short completion times of underground mine processes. To achieve the best production operation, a production plan should consider factors such as the working time and equipment capacity to arrange stope mining operations, equipment, and materials supply. Underground mining operation is a process with multiple working sites and multiple cycle operations, which include rock drilling, blasting, ventilation, supporting, ore-transportation, and backfilling. Once the stope mining begins, the above six steps must be intensively integrated to minimize the exposure time. Each step of stope mining has a significant effect on the whole mining plan; therefore, it is very important to form a reasonable configuration to achieve the mining plan target. The most difficult part of underground mining operation is how to organize the production process with limited resources (i. e., equipment and materials) to accomplish a large production task. In this paper, an integrated optimization model was described for compacting the integrated production process and efficiently dispatching production equipment. Two optimal objectives were combined to shorten the interval between production processes and overall working time. Production factors such as production cycle, type of operation equipment, and production capacity are analyzed in a mathematical model. In addition, the production safety was also considered and the time intervals between different working processes were considered to shorten the stope uncontrolled time to keep the production safety in the mathematical model. The best result of mining sequence and equipment dispatching was obtained by an improved genetic algorithm which searches the feasible solutions through primary-secondary two-step searching method. The model was validated in a large gold mine in China to work out the optimal equipment scheduling plan. The results show that compared with the traditional single-target optimization, the mining task can be accomplished effectively and the intervals between processes are minimized to improve safety in the mining operation. 
Keywords:
本文献已被 万方数据 等数据库收录!
点击此处可从《》浏览原始摘要信息
点击此处可从《》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号