仓上金矿新立矿区主竖井冻结实践
引用本文:徐景阁.仓上金矿新立矿区主竖井冻结实践[J].黄金,2002,23(9):17-18.
作者姓名:徐景阁
作者单位:山东省黄金工程建设监理中心
摘    要:位于海边仅15m左右的仓上金矿新立矿区主竖井利用并结法施工。由于夏季施工以及竖井旁海水养殖厂水位影响导致冻结壁难以形成,最终采取降水法使冻结成功。

关 键 词:竖井  施工  冻结法
文章编号:1001-1277(2002)09-0017-02
修稿时间:2002年6月20日

Practice of freezing in main shaft of Xinli mine field, Cangshang Gold Mine
Xu Jingge.Practice of freezing in main shaft of Xinli mine field, Cangshang Gold Mine[J].Gold,2002,23(9):17-18.
Authors:Xu Jingge
Affiliation:Shandong Province Gold Coustruction Supervision Center
Abstract:The main shaft of Xinli mine freld,Cangshang Gold Mine is to be built 15 meters away from the seaside with freezing method.Because the shaft is to be installed in summer,and the construction is interfered by the water of a sea water farm near the shaft,the shaft wall are very difficult to be frozen.However,dewatering is applied in the end,and a successful freezing is completed.
Keywords:shaft  construction  freezing method