SST-1 Refurbishment Progress: an Update
Authors:Subrata PRADHAN  SST- Mission Team
Affiliation:Institute for Plasma Research, Bhat, Gandhinagar-382 428, India
Abstract:Refurbishment of steady state tokamak (SST-1) primarily focused at addressing the issues and bottle-necks involving various subsystems of SST-1 as observed during earlier commis- sioning attempts, have progressed significantly. Under the refurbishment spectrum, all joints in the superconducting magnet system have been re-fabricated as low DC leak tight joint resistances, all toroidal field (TF) magnets have been equipped with 5 K radiation shields on the inner side and successfully tested for their rated parameters in cold under nominal currents, all vessel sectors and modules have been baked and tested under representative conditions, supporting helium and ni- trogen cryogenic facilities have been made > 99% reliable in various envisaged operating scenarios of SST-1. The reassemblies of the critical subsystems of the SST-1 machine shell have progressed aggressively and are nearing completion. Auxiliaries such as the baking facility for the vacuum vessel and first wall components, current leads assembly distributions, synchronized timing sys tem, reliable data acquisition and plasma control systems as well as essential diagnostics have also been readied towards the first plasma. A detailed engineering validation of the assembled SST-1 machine shell including field error measurements has been planned prior to first plasma attempts.
Keywords:cryogenic system  field error  magnet system  SST-1  vacuum system
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《等离子体科学和技术》浏览原始摘要信息
点击此处可从《等离子体科学和技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号