摘    要:东海大桥主航道桥为主跨420m五跨连续的双塔中央索面斜拉桥。主梁为在大跨径斜拉桥上首次采用的钢-混凝土箱形结合梁。重点介绍该桥的总体设计。

关 键 词:钢-混凝土箱形结合梁  斜拉桥  东海大桥  总体设计  

Overall design of cable-stayed bridge for main channel bridge of Donghai Bridge
Zongyu Gao.Overall design of cable-stayed bridge for main channel bridge of Donghai Bridge[J].Prestress Technology,2011,15(2):3-19.
Authors:Zongyu Gao
Affiliation:China Railway Bridge Survey and Design Institute Co., LTD., Wuhan, Hubei 430050
Abstract:The main channel bridge of Donghai Bridge is a five-span continuous two-tower central cable plane cable-stayed bridge with a main span of 420m. The main beam is the steel-concrete box combination beam first used in the long-span cable-stayed bridge. The overall design of the bridge is introduced.
Keywords:Steel-concrete box girder  Cable-stayed bridge  Donghai Bridge  Overall design