首页 | 本学科首页   官方微博 | 高级检索  
     

横泉水库供水发电洞进水塔施工工艺
引用本文:白永利. 横泉水库供水发电洞进水塔施工工艺[J]. 山西水利科技, 2009, 0(2): 33-34
作者姓名:白永利
作者单位:晋中市水利建筑工程总公司,晋中,030600
摘    要:横泉水库供水发电洞进水塔,具有塔高、混凝土工程量大和施工难度大的特点,在做好钢筋焊接和模型支护的基础上,运用混凝土输送泵设备,保证了工程质量和工程任务目标的实现。

关 键 词:横泉水库  供水发电洞  进水塔  施工工艺

On Construction Technique of Intake Tower of Water Supply and Power Tunnel in Hengquan Reservoir
BAI Yong-li. On Construction Technique of Intake Tower of Water Supply and Power Tunnel in Hengquan Reservoir[J]. Shanxi Hydrotechnics, 2009, 0(2): 33-34
Authors:BAI Yong-li
Affiliation:BAI Yong-li
Abstract:The intake tower of water supply and power tunnel in Hengquan Reservoir possesses following features: high tower, big quantity of works and big difficulties. To make a good job on reinforcement-welding, on form work and on pumping concrete to place, the proiect quality has been ensured and the project target has been achieved.
Keywords:Hengquan Reservoir water supply and power tunnel intake tower construction technique
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号